Monday, June 22, 2009

A few good men and a concrete pump

Concrete pump at the front of the house, pumping about 30m to the back.

Amazingly the formwork is removed in the afternoon of the same day. Jeff The Concreter alternates between using the helecoptery thing and covering the slab with plastic as the weather alternates between sunshine and rain. They started at 6:45 am and left about 5:30 in the almost dark.
The formwork, pumping and finishing was $10,312.